CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

CASE STUDY | City of Bonn

Planning instead of checking: how Bonn cut data turnaround from months to weeks

The City of Bonn used to wait up to three months for its inspection data to come back checked. That held up rehabilitation planning and tied up engineers in quality control. Since 2022, the wait is one to two weeks.

By Christian Koch

By Christian Koch

October 2026

AT A GLANCE

1 to 2 weeks

1 to 2 weeks

turnaround, down from up to three months

turnaround, down from up to three months

around 2 in 100 pipe sections

around 2 in 100 pipe sections

still need manual rework

still need manual rework

65 km and 2,200 manholes

65 km and 2,200 manholes

assessed per year since 2022

assessed per year since 2022

Figures supplied by the City of Bonn. The "before" values refer to their previous external review process.

The Starting Point

The City of Bonn operates and maintains its own sewer network, but sent the assessment of its inspection data to an external engineering firm. The process was slow: up to three months passed before the checked data came back, sometimes longer.


That did more than delay rehabilitation planning. Because results varied between assessors, the subsequent quality control tied up capacity in Bonn's own team –capacity that was missing from the actual planning work.

Before and after
Before
Today

Assessment

Outsourced to an engineering firm

Coding and classification through Pallon

Coding and classification through Pallon

Turnaround

Up to three months, sometimes longer

1 to 2 weeks

1 to 2 weeks

Consistency

Varied by assessor

Consistent across all batches

Consistent across all batches

Rework

Extensive quality control in-house

Around 2 in 100 pipe sections

Around 2 in 100 pipe sections

Cost

External review

Comparable

Comparable

How the work runs now

1

Inspection as before.

Nothing changes about the field work.

2

Coding and classification through Pallon.

Data comes back coded and classified within one to two weeks, consistent across every batch.

3

Review in-house.

Filtering lets the team select the relevant sections directly. Individual cases can be edited on the platform before export.

4

Export into their own systems.

The reviewed data goes forward as a planning basis.

What Changed

Costs are at the same level as the previous external review. The gain sits elsewhere: rehabilitation planning starts weeks earlier, and the team spends its time planning rather than checking.


With around two in every hundred pipe sections still needing manual rework, the review effort has become predictable. Bonn has worked with Pallon since 2022, awarded through a public tender.

[Quote to be sourced: what Bonn would tell a comparable network operator facing the same decision.]
[Name], [Role], City of Bonn

[Name], [Role], City of Bonn

The City of Bonn operates and maintains the sewer network of Germany's former capital in North Rhine-Westphalia. It has worked with Pallon since 2022, awarded through public tender, assessing around 65 km of pipe and 2,200 manholes each year.

Customer type

Network operator

Region

North Rhine-Westphalia, Germany

Assets

Pipes and manholes

Annual volume

65 km of pipe, 2,200 manholes

Standard

EN 13508-2

Customer since

2022

Procurement

Public tender, multi-year

AI Powered

AI Powered

AI Powered

AI Powered

See what this looks like on your own footage

Send us a sample project and we will show you the coded result and what your review time would look like.